How to install metal roof panel?
toyota1515 > 03-06-2018, 06:15 AM
Before installing the metal roof panel, check the specification model, geometric dimension, appearance, length and quantity of the metal roof board in the entrance, and check the layout plan of the metal roof. When the metal roof panel is installed, the position of the first metal roof panel shall be determined according to the plate-plate diagram. Generally, it starts from the direction of the prevailing wind direction.
When the light plate is connected, the two butyl duct tape is finished, and the adhesive tape is filled with glass glue. The metal roof panel and the mining plate are connected, and the two sides of the mining plate are removed. And insert in the roof is 160 mm or and purlin overlap, and the mining plate paste butyl tape two above, with structural adhesive, and will gather together with choi steel plate in the bracket above, prevent the reverse flow of water.
The personnel can be seated on the steel ladder, and the harness is mounted on the purline or the steel ladder. To install the pull rod, hold or grip the lever with pliers, and tighten the nuts with a wrench on the other end. Due to the long length of the metal roof panel, the installation process may slip, move up, or there will be some place in the metal roof panel bite. When the metal roofing plate is laid, the hole should be reserved, such as the mining plate and the slope gas building, so as to facilitate the correct installation of the lighting panel and the smooth slope gas building.